|
These are examples of basic routines that will meet all of the requirements of the EGR’s BARS Kip - A Cast Hdst - B Toe Hdst - C Toe Up - B Long Kip - A Straddle Cast Hdst - A
Giant - B Giant ½ - B Front giant ½ - B Db tuck - B 1 C (.3) / 6 Bs (1.2) / 3 A’s (.3) DV - 1.6 CV - None EGR - 2.5 Total A Panel = 4.3 Back layout - A / 0 / 0/ B |