E  Optional Requirements (Hopes Division)

o       FIG Requirements (with EGR modifications)

o       *  indicates a modification from FIG

o       Vault – FIG,  two vaults (no change)

o       Bars

         EGR = 2.5

·        One element from Group 2, 4, or 5 = .5

·        *B Dismount = .5

·        *Must include ONE of the three flight groups = .75

·        *Must include at least ½ turn = .75

o       Beam

     EGR = 2.5

·        180 degree front to back split leap = .5

·        Full turn = .5

·        Acro Forward/Sideward = .5

·        Acro Backward = .5

·        * B Dismount = .5

o       Floor

EGR = 2.5

·        180 degree forward/backward split leap or jump = .5

·        Full Turn = .5

·        Salto Forward/Sideward = .5

·        Salto Backward = .5

·        *B Dismount